There is still the back of the house- what was once the laundry room. The new foundation is poured and the utility sink has left a yellow mark on the wall. Sean & I were put to work. The main job was the hole that Sean made in the existing foundation so that if one wanted to crawl in our crawl space they could wiggle their way under this new section.The second are bolts drilled into the existing foundation that will serve as connectors between the new house and the old. Sean drilled the holes but I got to clean them with a toothbrush and then mix the epoxy and put in the bolts. Of course I got the epoxy on my pants and hair as I worked. No surprise. But all is well, we think we're ready for the framers to frame.